logo
Home ProductsExcavator Boom Arm

Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term

Certification
China Defeng Mechanical Manufacturing Limited certification
China Defeng Mechanical Manufacturing Limited certification
Customer Reviews
My dear supplier,also my good friend. We have coperation in a long time and I trust you very much. I wish you can be better and better.

—— Stella

Thank goodness I came across you all. The quality and pricing of your products have given me a significant edge in the market.

—— Arlin

I'm Online Chat Now

Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term

Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term
Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term

Large Image :  Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term

Product Details:
Place of Origin: Guangdong, China
Brand Name: DF
Certification: CE, ISO 9001
Model Number: DF-TB300
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Stretch film wrap, steel skid, 40HQ container
Delivery Time: 7-15 days after drawing confirmation
Payment Terms: T/T, L/C at sight, Western Union
Supply Ability: 100 sets per month

Sliding Telescopic Arm DF-TB300 5600 kg 30 Ton Teleskopausleger German Term

Description
Model: DF-TB300 Arm Weight: 5600 Kg
Suitable Excavator: 30 Ton Class Boom Type: Two Stage Telescopic
Main Material: Q690 High Strength Steel Warranty: 12 Months
Price: Negotiable Delivery Time: 7-15 Days
Highlight:

sliding telescopic arm

,

30 ton teleskopausleger

,

5600 kg telescopic excavator arm

Arm Description

German buyers know this attachment as a Teleskopausleger, and the DF-TB300 is the 30 ton version of that idea: 18 m of reach from two sliding sections and a 5600 kg arm built around a Q690 box. It suits contractors working embankments, canals and harbour walls where the carrier has to stay on a stable surface while the bucket works well beyond the tracks. The extension stroke is servo controlled through the machine's own auxiliary circuit, so no extra valve block is required on most carriers.

Section alignment is set with shimmed wear pads on four faces, which keeps the inner boom from rocking under side load. The stick head is reinforced with a full wrap collar and the bucket pin area is machined after welding. Painting follows a three coat system: zinc rich primer, epoxy intermediate and a two component polyurethane finish that holds colour under UV in open yards.

DF-TB300 sliding telescopic arm 30 ton 5600 kg

18 m reach arm assembled for a stroke test.

Construction Highlights
  • 18 m reach on two sections: sized for 30 ton carriers doing canal, harbour and embankment work.
  • Shimmed four face alignment: wear pads adjusted on all sides to stop the inner boom rocking under side load.
  • Wrapped stick head: full collar reinforcement around the bucket pin boss, the highest stress point on the stick.
  • Three coat paint system: zinc primer, epoxy mid coat and UV stable polyurethane top coat for outdoor storage.
  • Auxiliary circuit friendly: extension cylinders plumbed for the carrier's standard auxiliary valve on most brands.
  • German terminology documentation: Teleskopausleger wording on drawings, manual and packing list for EU import.
Technical Specifications
ParameterSpecification
Product TypeSliding telescopic arm
ModelDF-TB300
Suitable Excavator30 ton class
Arm Weight5600 kg
Maximum Reach18 m
Sections2
Main MaterialQ690 plate
AlignmentShimmed wear pads, four faces
Paint SystemZinc primer + epoxy + polyurethane
Warranty12 months
MOQ1 set
PriceNegotiable
Delivery Time7-15 days
Place of OriginGuangdong, China
CertificationCE, ISO 9001
Applications

Canal and harbour maintenance crews use the DF-TB300 to clean berths and slopes from the quay edge, where the carrier cannot be positioned over water. Earthworks contractors mount it for batter trimming on highway embankments, and landfill operators use the reach to place cover material without driving onto the tipping face. With a ripper tooth fitted, the same arm breaks hardpan in drainage reserves where a standard boom cannot stand far enough back.

DF-TB300 telescopic arm wear pad shim alignment

Wear pads shimmed on four faces to stop boom rocking.

DF-TB300 telescopic arm stick head wrap collar

Wrapped stick head with bucket pin boss after machining.

Production Base

Every DF-TB300 leaves our 3000 square metre Guangzhou plant, where plate is cut on CNC plasma, formed on hydraulic press brakes and welded in positioners by welders who specialise in excavator structures. Pin bores are line bored on a horizontal borer after stress relief, then checked with a bore gauge. Alongside telescopic arms the plant produces booms and sticks, rock buckets and amphibious excavator pontoons to customer drawings, and our trading desk supplies used excavators of all major brands for clients who want a complete package.

DF telescopic boom factory production line Guangzhou

Positioner welding of a 30 ton boom box section.

Testing and Delivery

Structure checks cover ultrasonic plate thickness, magnetic particle inspection of the boom foot and stick head, bore gauging and a full extension stroke test with the supplied cylinders. The arm is then film wrapped and banded to a skid for a 40HQ container, with wear pads, pins and seals packed in a separate crate. Production takes 7-15 days after drawing approval and the structure is warranted for 12 months.

Sophie – Sales Manager (Telescopic Boom & Attachments)

Sophie business card

Our factory Guangzhou

Guangzhou workshop: 3000 m2 of boom, bucket and amphibious pontoon production.

Contact Details
Defeng Mechanical Manufacturing Limited

Contact Person: Chen

Tel: +8618026254557

Send your inquiry directly to us (0 / 3000)