|
Product Details:
|
| Model: | DF-TB300 | Arm Weight: | 5600 Kg |
|---|---|---|---|
| Suitable Excavator: | 30 Ton Class | Boom Type: | Two Stage Telescopic |
| Main Material: | Q690 High Strength Steel | Warranty: | 12 Months |
| Price: | Negotiable | Delivery Time: | 7-15 Days |
| Highlight: | sliding telescopic arm,30 ton teleskopausleger,5600 kg telescopic excavator arm |
||
German buyers know this attachment as a Teleskopausleger, and the DF-TB300 is the 30 ton version of that idea: 18 m of reach from two sliding sections and a 5600 kg arm built around a Q690 box. It suits contractors working embankments, canals and harbour walls where the carrier has to stay on a stable surface while the bucket works well beyond the tracks. The extension stroke is servo controlled through the machine's own auxiliary circuit, so no extra valve block is required on most carriers.
Section alignment is set with shimmed wear pads on four faces, which keeps the inner boom from rocking under side load. The stick head is reinforced with a full wrap collar and the bucket pin area is machined after welding. Painting follows a three coat system: zinc rich primer, epoxy intermediate and a two component polyurethane finish that holds colour under UV in open yards.
![]()
18 m reach arm assembled for a stroke test.
Construction Highlights| Parameter | Specification |
|---|---|
| Product Type | Sliding telescopic arm |
| Model | DF-TB300 |
| Suitable Excavator | 30 ton class |
| Arm Weight | 5600 kg |
| Maximum Reach | 18 m |
| Sections | 2 |
| Main Material | Q690 plate |
| Alignment | Shimmed wear pads, four faces |
| Paint System | Zinc primer + epoxy + polyurethane |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Delivery Time | 7-15 days |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO 9001 |
Canal and harbour maintenance crews use the DF-TB300 to clean berths and slopes from the quay edge, where the carrier cannot be positioned over water. Earthworks contractors mount it for batter trimming on highway embankments, and landfill operators use the reach to place cover material without driving onto the tipping face. With a ripper tooth fitted, the same arm breaks hardpan in drainage reserves where a standard boom cannot stand far enough back.
![]()
Wear pads shimmed on four faces to stop boom rocking.
![]()
Wrapped stick head with bucket pin boss after machining.
Production BaseEvery DF-TB300 leaves our 3000 square metre Guangzhou plant, where plate is cut on CNC plasma, formed on hydraulic press brakes and welded in positioners by welders who specialise in excavator structures. Pin bores are line bored on a horizontal borer after stress relief, then checked with a bore gauge. Alongside telescopic arms the plant produces booms and sticks, rock buckets and amphibious excavator pontoons to customer drawings, and our trading desk supplies used excavators of all major brands for clients who want a complete package.
![]()
Positioner welding of a 30 ton boom box section.
Testing and DeliveryStructure checks cover ultrasonic plate thickness, magnetic particle inspection of the boom foot and stick head, bore gauging and a full extension stroke test with the supplied cylinders. The arm is then film wrapped and banded to a skid for a 40HQ container, with wear pads, pins and seals packed in a separate crate. Production takes 7-15 days after drawing approval and the structure is warranted for 12 months.
Sophie – Sales Manager (Telescopic Boom & Attachments)
![]()
![]()
Guangzhou workshop: 3000 m2 of boom, bucket and amphibious pontoon production.
Contact Person: Chen
Tel: +8618026254557