|
Product Details:
|
| Product Type: | Telescopic Boom Arm | Compatible Machine: | 35 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 7-30 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 35 ton excavator telescopic boom,7m telescopic boom Q355B,custom telescopic boom for PC300 |
||
This telescopic boom arm is engineered for 35 ton excavators that work in dredging, trenching and slope jobs. With 7-30 m of reach, reinforced box sections and a matched bucket linkage, it delivers long reach performance without changing the base machine.
Plate is cut on a CNC plasma table, formed on a hydraulic press brake, then assembled in a welding jig. The Q355B box section is welded in passes with interpass cleaning, and the pivot bosses are machined after welding to hold bore alignment.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Product Type | Telescopic Boom Arm |
| Compatible Machine | 35 Ton class excavator |
| Maximum Reach | 7-30 m |
| Sections | 2-3 sections |
| Main Material | Q355B |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: this set is built for PC300 / PC360 carriers and can be adjusted for other 35 ton machines after drawing confirmation.
Everything is made under our own roof: 3000 square meters of production space, a CNC plasma cutting table, hydraulic bending machines, welding jigs operated by senior welders, machining of pin bores, and a painting line. Nothing is outsourced to trading partners.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Inspection happens at three stages: plate thickness and cut accuracy, weld appearance and penetration at critical joints, then final assembly and hydraulic test.
We load in containers with timber or steel dunnage to prevent movement at sea. Customized sets take 5-30 days to produce, and standard lengths can be ready sooner.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Send your excavator model and the working depth you need, and our engineer will reply with a drawing and price within one working day.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557