|
Product Details:
|
| Machine Model: | SK300LC-8 | Tonnage: | 30 T |
|---|---|---|---|
| Boom And Arm Length: | 22 M | Total Weight: | Approx. 6600 Kg |
| Max Digging Depth: | 18 M | Recommended Bucket: | 0.5 M3 |
| Material: | Q355B High Strength Steel | Cylinders: | Boom, Arm And Bucket Cylinders Included |
| Condition: | New | Warranty: | 12 Months |
| Packing: | Single Piece Packing | ||
| Highlight: | SK300LC-8 Long Reach Boom,22 m Excavator Boom Arm,Kobelco SK300LC-8 Boom Arm |
||
When the trench is wider than the machine can bridge, the answer is reach, not a bigger excavator. This 22 m long boom arm for the SK300LC-8 extends the working envelope to 18 m below grade while staying inside the hydraulic limits of the 30 t base machine.
![]()
| Machine model | Kobelco SK300LC-8 (30 t class) |
| Boom and arm length | 22 m (boom + arm, pinned) |
| Total weight | approx. 6600 kg |
| Max digging depth | 18 m |
| Recommended bucket | 0.5 m³ |
| Material | Q355B high strength steel plate |
| Cylinders | Boom, arm and bucket cylinders included |
| Condition | New, painted to your colour |
| Item | 12 t | 20 t | 25 t | 30 t | 35 t | 40 t | 45 t |
|---|---|---|---|---|---|---|---|
| Extended arm length | 10 m | 18 m | 20 m | 22 m | 24 m | 26 m | 28 m |
| Extended arm weight | 2.8 t | 4.8 t | 5.6 t | 6.6 t | 7.5 t | 8.5 t | 9.5 t |
| Dig bucket capacity | 0.2 m³ | 0.4 m³ | 0.45 m³ | 0.5 m³ | 0.6 m³ | 0.7 m³ | 0.8 m³ |
| Max excavating height | 7 m | 15 m | 17 m | 19 m | 21 m | 23 m | 25 m |
| Max digging radius | 9 m | 17 m | 19 m | 21 m | 23 m | 25 m | 27 m |
| Max digging depth | 6 m | 14 m | 16 m | 18 m | 20 m | 22 m | 24 m |
| Transport height | 2.2 m | 3 m | 3.2 m | 3.2 m | 3.2 m | 3.4 m | 3.4 m |
| Max plus length | 15 m | 20 m | 22 m | 24 m | 26 m | 28 m | 30 m |
Table: standard long reach boom specifications by carrier tonnage. Values for other tonnages and custom digging depths are available on request.
The 3000 square metre floor in Xinheng Town, Jiedong District, Jieyang is where the steel is cut and welded: boom arms, buckets and amphibious excavator floating pontoons, built by experienced welders with CNC equipment and inspection at every stage.
| Price | Negotiable — length and destination port decide the final figure |
| Delivery | 7–15 days after drawing approval |
| Packing | Single piece packing — one boom set per package, joint protected and strapped |
| Payment | T/T, L/C, Western Union, |
| Minimum order | 1 set |
Since 2019 Defeng Mechanical Manufacturing Limited has supplied excavator attachments to contractors, rental fleets and dealers worldwide, alongside a used machine and spare parts business covering all major brands.
![]()
Tell us the model, the depth you need and the bucket size; Sophie will return a drawing and a firm price.
Defeng Mechanical Manufacturing Limited | Jieyang factory & Guangzhou office, Guangdong, China
Contact Person: Chen
Tel: +8618026254557