|
Product Details:
|
| Machine Model: | SK250LC-8 | Tonnage: | 25 T |
|---|---|---|---|
| Boom And Arm Length: | 20 M | Total Weight: | Approx. 5600 Kg |
| Max Digging Depth: | 16 M | Recommended Bucket: | 0.45 M3 |
| Material: | Q355B High Strength Steel | Cylinders: | Boom, Arm And Bucket Cylinders Included |
| Condition: | New | Warranty: | 12 Months |
| Packing: | Single Piece Packing | ||
| Highlight: | SK250LC-8 Long Reach Boom,20 m Excavator Boom Arm,Kobelco SK250LC-8 Boom Arm |
||
| Machine model | Kobelco SK250LC-8 (25 t class) |
| Boom and arm length | 20 m (boom + arm, pinned) |
| Total weight | approx. 5600 kg |
| Max digging depth | 16 m |
| Recommended bucket | 0.45 m³ |
| Material | Q355B high strength steel plate |
| Cylinders | Boom, arm and bucket cylinders included |
| Condition | New, painted to your colour |
| Item | 12 t | 20 t | 25 t | 30 t | 35 t | 40 t | 45 t |
|---|---|---|---|---|---|---|---|
| Extended arm length | 10 m | 18 m | 20 m | 22 m | 24 m | 26 m | 28 m |
| Extended arm weight | 2.8 t | 4.8 t | 5.6 t | 6.6 t | 7.5 t | 8.5 t | 9.5 t |
| Dig bucket capacity | 0.2 m³ | 0.4 m³ | 0.45 m³ | 0.5 m³ | 0.6 m³ | 0.7 m³ | 0.8 m³ |
| Max excavating height | 7 m | 15 m | 17 m | 19 m | 21 m | 23 m | 25 m |
| Max digging radius | 9 m | 17 m | 19 m | 21 m | 23 m | 25 m | 27 m |
| Max digging depth | 6 m | 14 m | 16 m | 18 m | 20 m | 22 m | 24 m |
| Transport height | 2.2 m | 3 m | 3.2 m | 3.2 m | 3.2 m | 3.4 m | 3.4 m |
| Max plus length | 15 m | 20 m | 22 m | 24 m | 26 m | 28 m | 30 m |
Table: standard long reach boom specifications by carrier tonnage. Values for other tonnages and custom digging depths are available on request.
A standard boom cannot reach the bottom of a silt pond, and a purpose-built long reach machine costs a fortune. Bolt-on reach is the practical middle path. This 20 m long reach boom assembly suits the SK250LC-8 and keeps the standard hydraulic pump working at its design pressure.
![]()
| Matched geometry | Boom, arm and bucket linkage are calculated together, so the digging force curve suits the 25 t machine rather than fighting it. |
| Reinforced root section | Doubler plates and internal baffles at the boom foot take the bending load that cracks light-duty copies. |
| Cylinders included | Boom, arm and bucket cylinders arrive matched to the set, with hoses and pins ready for installation. |
| Transport planned | Sections are split at the factory joint so the set fits a 40 ft container or flat rack without cutting. |
Our 3000 square metre plant in Xinheng Town, Jiedong District, Jieyang is set up for exactly this kind of work: excavator boom arms, buckets and amphibious excavator floating pontoons are cut, fitted and welded here by experienced welders using CNC plasma cutting, rolling and machining equipment.
Defeng Mechanical Manufacturing Limited has built and exported excavator attachments since 2019. 50–100 staff, 80–90% of output shipped overseas, and a trading desk that supplies used excavators, engines and spare parts of all major brands.
![]()
| Price | Negotiable — length and destination port decide the final figure |
| Delivery | 7–15 days after drawing approval |
| Packing | Single piece packing — one boom set per package, joint protected and strapped |
| Payment | T/T, L/C, Western Union, |
| Minimum order | 1 set |
Tell us the model, the depth you need and the bucket size; Sophie will return a drawing and a firm price.
Defeng Mechanical Manufacturing Limited | Jieyang factory & Guangzhou office, Guangdong, China
Contact Person: Chen
Tel: +8618026254557