logo
Home ProductsExcavator Boom Arm

DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction

Certification
China Defeng Mechanical Manufacturing Limited certification
China Defeng Mechanical Manufacturing Limited certification
Customer Reviews
My dear supplier,also my good friend. We have coperation in a long time and I trust you very much. I wish you can be better and better.

—— Stella

Thank goodness I came across you all. The quality and pricing of your products have given me a significant edge in the market.

—— Arlin

I'm Online Chat Now

DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction

DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction
DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction

Large Image :  DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction

Product Details:
Place of Origin: Guangdong, China
Brand Name: DF
Certification: CE, ISO9001
Model Number: Customized
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: Negotiable
Packaging Details: SINGLE
Delivery Time: 7-30 days
Payment Terms: L/C,T/T,Western Union,
Supply Ability: 10 Sets per Month

DF Manufacturer 20 Ton Excavator Long Reach Boom Arm 7-30 m for Jetty Construction

Description
Product Type: Long Reach Boom Arm Compatible Machine: 20 Ton Class Excavator
Sections: 2-3 Sections Main Material: Q690D
Warranty: 12 Months MOQ: 1 Set
Lead Time: 5-30 Days Monthly Capacity: 100 Sets
Maximum Reach: 7-30 M
Highlight:

20 ton excavator long reach boom

,

7m long reach boom Q690D

,

oem long reach boom manufacturer china

20 Ton Excavator Long Reach Boom Arm with 7-30 m Reach

When a job site needs more reach than the machine offers, this long reach boom arm is the practical answer for 20 ton carriers. Maximum working reach is 7-30 m, the boom is reinforced at the highest stress points, and transport dimensions stay within standard container limits.

The boom uses Q690D plate for the main box, with internal baffles at the pivot area and a reinforced heel. Pin bores are line bored after welding so the pins enter without force, and the cylinder mounts are positioned to keep the original geometry of the carrier.

long reach boom arm production

Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.

Technical Data

Structure MaterialQ690D
FinishShot blasting and two component polyurethane paint
Warranty Period12 months
Minimum Order1 set
Price TermsNegotiable
Monthly Output100 sets
Production Time5-30 days
Brand NameDF
OriginGuangdong, China
CertificatesCE, ISO9001
Attachment TypeLong Reach Boom Arm
Suitable Carrier20 Ton class excavator
Max Working Reach7-30 m
Boom Sections2-3 sections

Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 20 ton machine before cutting.

Manufacturing Base

Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.

long reach boom arm production

Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.

  • In house cutting welding machining and painting
  • Dimensional inspection at each stage
  • Cylinders and hose kits supplied matched
  • One year structural warranty
  • Worldwide shipping experience

Typical Job Sites

  • Irrigation and drainage channel digging
  • Tunnel portal clearing
  • Pond and lake sediment removal
  • Railway embankment repair
  • Deep utility trenching in tight sites

Quality Check and Loading

Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.

Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.

long reach boom arm production

Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.

Contact

Share your machine model and job site photos, and we will recommend the right boom length and quote within 12 hours.

Sophie - Sales Manager | Defeng Machinery, Guangzhou

Sophie business card Defeng Machinery

siness card Defeng Machinery" style="max-width:100%;width:420px;height:auto;border:1px solid #e4e8ee;border-radius:6px;" />

Contact Details
Defeng Mechanical Manufacturing Limited

Contact Person: Chen

Tel: +8618026254557

Send your inquiry directly to us (0 / 3000)