|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 36 Ton Class Excavator |
|---|---|---|---|
| Sections: | 2-3 Sections | Main Material: | Q690D |
| Warranty: | 12 Months | MOQ: | 1 Set |
| Lead Time: | 5-30 Days | Monthly Capacity: | 100 Sets |
| Maximum Reach: | 7-30 M | ||
| Highlight: | 36 ton excavator long reach boom,7m long reach boom Q690D,oem long reach boom manufacturer china |
||
Manufactured to order for 36 ton carriers, this long reach boom arm provides 7-30 m of working reach with reinforced joints and a balanced centre of gravity. Drawings are approved before cutting, so the finished arm matches your machine and your job requirement.
Design details that matter on site: a reinforced boom foot, doubled side plates at the bucket end, greased pin joints and a hose routing that keeps lines clear of the cab. Main structure is Q690D, chosen for yield strength and low temperature toughness.
![]()
Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.
| Product Type | Long Reach Boom Arm |
| Compatible Machine | 36 Ton class excavator |
| Maximum Reach | 7-30 m |
| Sections | 2-3 sections |
| Main Material | Q690D |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 36 ton machine before cutting.
We are the manufacturer, not a middleman. The 3000 square meter workshop runs cutting, bending, jig welding by experienced welders, machining and painting in sequence, which is why we can hold 100 sets per month and still control weld quality.
![]()
Our production team checks reach, lift and hose routing on every long reach boom we build.
Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.
Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
Send your excavator model and the working depth you need, and our engineer will reply with a drawing and price within one working day.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557