|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 15 Ton Class Excavator |
|---|---|---|---|
| Sections: | 2-3 Sections | Main Material: | Q690D |
| Warranty: | 12 Months | MOQ: | 1 Set |
| Lead Time: | 5-30 Days | Monthly Capacity: | 100 Sets |
| Maximum Reach: | 7-30 M | ||
| Highlight: | 15 ton excavator long reach boom,7m long reach boom Q690D,oem long reach boom manufacturer china |
||
Dredging and deep trench work put heavy bending loads on a long arm. This long reach boom arm answers that with 7-30 m of reinforced reach, thick box sections and stress relieved welds, built here for 15 ton class excavators.
We calculate the section size from the required 7-30 m and the carrier's working weight, then cut Q690D plate accordingly. Welds at the boom foot and stick head are inspected visually and by dye penetrant before the paint stage.
| Product Type | Long Reach Boom Arm |
| Compatible Machine | 15 Ton class excavator |
| Maximum Reach | 7-30 m |
| Sections | 2-3 sections |
| Main Material | Q690D |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 15 ton machine before cutting.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
Everything is made under our own roof: 3000 square meters of production space, a CNC plasma cutting table, hydraulic bending machines, welding jigs operated by senior welders, machining of pin bores, and a painting line. Nothing is outsourced to trading partners.
Quality control covers material certificates, weld inspection at the boom foot and stick head, bore measurement and a full hydraulic leak test with the supplied cylinders.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.
Share your machine model and job site photos, and we will recommend the right boom length and quote within 12 hours.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557