|
Product Details:
|
| Product Type: | Telescopic Boom Arm | Compatible Machine: | Customized Tonnage Class Excavator |
|---|---|---|---|
| Maximum Reach: | 7-30 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | custom ton excavator telescopic boom,7m telescopic boom Q355B,oem telescopic boom manufacturer china |
||
For rental fleets and dealers we produce this telescopic boom arm in matched batches for customized tonnage excavators. Reach is 7-30 m, weight is distributed to protect the swing bearing, and every set ships with the correct linkage pins and bushings.
Structural choices are driven by fatigue life: continuous welds instead of stitch welds, rounded transitions at the section change, and a machined pin boss that spreads load into the side plate. Material is Q355B with mill certificates available on request.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Structure Material | Q355B |
| Finish | Shot blasting and two component polyurethane paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
| Attachment Type | Telescopic Boom Arm |
| Suitable Carrier | Customized Tonnage class excavator |
| Max Working Reach | 7-30 m |
| Boom Sections | 2-3 sections |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your customized tonnage machine before cutting.
Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Inspection happens at three stages: plate thickness and cut accuracy, weld appearance and penetration at critical joints, then final assembly and hydraulic test.
Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Share your machine model and job site photos, and we will recommend the right boom length and quote within 12 hours.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557