logo
Home ProductsExcavator Boom Arm

DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work

Certification
China Defeng Mechanical Manufacturing Limited certification
China Defeng Mechanical Manufacturing Limited certification
Customer Reviews
My dear supplier,also my good friend. We have coperation in a long time and I trust you very much. I wish you can be better and better.

—— Stella

Thank goodness I came across you all. The quality and pricing of your products have given me a significant edge in the market.

—— Arlin

I'm Online Chat Now

DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work

DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work
DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work

Large Image :  DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work

Product Details:
Place of Origin: Guangdong, China
Brand Name: DF
Certification: CE, ISO9001
Model Number: Customized
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD10000-USD60000
Packaging Details: bulk
Delivery Time: 15-40 days
Payment Terms: T/T,L/C
Supply Ability: 50sets /month

DF Factory 120 Ton Excavator Long Reach Boom Arm 7-30 m for Port Dredging Work

Description
Product Type: Long Reach Boom Arm Compatible Machine: 120 Ton Class Excavator
Maximum Reach: 7-30 M Sections: 2-3 Sections
Main Material: Q690D Warranty: 12 Months
MOQ: 1 Set Lead Time: 5-30 Days
Monthly Capacity: 100 Sets
Highlight:

120 ton excavator long reach boom

,

7m long reach boom Q690D

,

oem long reach boom manufacturer china

120 Ton Excavator Long Reach Boom Arm with 7-30 m Reach

Contractors order this long reach boom arm when they need working depth beyond what their carrier was designed for. We build it for 120 ton class machines to reach 7-30 m, keeping the original hydraulic circuit, so the excavator stays balanced and the operator keeps the same controls.

Design details that matter on site: a reinforced boom foot, doubled side plates at the bucket end, greased pin joints and a hose routing that keeps lines clear of the cab. Main structure is Q690D, chosen for yield strength and low temperature toughness.

long reach boom arm production

Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.

Specifications

Product TypeLong Reach Boom Arm
Compatible Machine120 Ton class excavator
Maximum Reach7-30 m
Sections2-3 sections
Main MaterialQ690D
Surface FinishShot blasting and two component polyurethane paint
Warranty12 months
MOQ1 set
PriceNegotiable
Monthly Capacity100 sets
Lead Time5-30 days
BrandDF
Place of OriginGuangdong, China
CertificationCE, ISO9001

Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 120 ton machine before cutting.

Where It Is Used

  • Municipal water and gas line trenching
  • Wetland and pond desilting
  • Highway and railway slope repair
  • Demolition of tall structures
  • Flood control channel cleaning

Factory and Equipment

We are the manufacturer, not a middleman. The 3000 square meter workshop runs cutting, bending, jig welding by experienced welders, machining and painting in sequence, which is why we can hold 100 sets per month and still control weld quality.

long reach boom arm production

Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.

  • OEM and ODM with your own brand
  • Boom length customized to your job
  • Matching bucket and linkage available
  • Fast reply within 12 working hours
  • 5-30 days production lead time

Inspection and Packing

Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.

Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.

long reach boom arm production

Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.

Contact

Tell us the carrier model and reach you require, we will confirm drawing, price and delivery date the same day.

Sophie - Sales Manager | Defeng Machinery, Guangzhou

Sophie business card Defeng Machinery

siness card Defeng Machinery" style="max-width:100%;width:420px;height:auto;border:1px solid #e4e8ee;border-radius:6px;" />

Contact Details
Defeng Mechanical Manufacturing Limited

Contact Person: Chen

Tel: +8618026254557

Send your inquiry directly to us (0 / 3000)