logo
Home ProductsExcavator Boom Arm

DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work

Certification
China Defeng Mechanical Manufacturing Limited certification
China Defeng Mechanical Manufacturing Limited certification
Customer Reviews
My dear supplier,also my good friend. We have coperation in a long time and I trust you very much. I wish you can be better and better.

—— Stella

Thank goodness I came across you all. The quality and pricing of your products have given me a significant edge in the market.

—— Arlin

I'm Online Chat Now

DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work

DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work
DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work

Large Image :  DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work

Product Details:
Place of Origin: Guangdong, China
Brand Name: DF
Certification: CE, ISO9001
Model Number: Customized
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD6800-USD8000
Packaging Details: bulk
Delivery Time: 7-30 days
Payment Terms: ,L/C,D/A,D/P,T/T,Western Union,
Supply Ability: 100 sets/month

DF Factory 20-22 Ton Excavator Long Reach Boom Arm 15-20 m for Irrigation Channel Work

Description
Product Type: Long Reach Boom Arm Compatible Machine: 20-22 Ton Class Excavator
Maximum Reach: 15-20 M Sections: 2-3 Sections
Main Material: Q355B Warranty: 12 Months
MOQ: 1 Set Lead Time: 5-30 Days
Monthly Capacity: 100 Sets
Highlight:

20-22 ton excavator long reach boom

,

15m long reach boom Q355B

,

oem long reach boom manufacturer china

20-22 Ton Excavator Long Reach Boom Arm with 15-20 m Reach

Manufactured to order for 20-22 ton carriers, this long reach boom arm provides 15-20 m of working reach with reinforced joints and a balanced centre of gravity. Drawings are approved before cutting, so the finished arm matches your machine and your job requirement.

Each set consists of a long boom, a matching stick, hydraulic cylinders, hoses and linkage pins. The Q355B structure is dimensioned for 15-20 m reach, and the counterweight requirement is calculated so the carrier stays stable at full extension.

Specifications

Product TypeLong Reach Boom Arm
Compatible Machine20-22 Ton class excavator
Maximum Reach15-20 m
Sections2-3 sections
Main MaterialQ355B
Surface FinishShot blasting and two component polyurethane paint
Warranty12 months
MOQ1 set
PriceNegotiable
Monthly Capacity100 sets
Lead Time5-30 days
BrandDF
Place of OriginGuangdong, China
CertificationCE, ISO9001

Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 20-22 ton machine before cutting.

long reach boom arm production

Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.

Where It Is Used

  • Municipal water and gas line trenching
  • Wetland and pond desilting
  • Highway and railway slope repair
  • Demolition of tall structures
  • Flood control channel cleaning

Factory and Equipment

Our plant in Guangzhou covers 3000 square meters and handles the whole process in house. Senior welders with more than fifteen years on excavator attachments run the jigs, supported by CNC plasma cutting, a hydraulic press brake, automatic welding stations, shot blasting and a two component paint line.

  • In house cutting welding machining and painting
  • Dimensional inspection at each stage
  • Cylinders and hose kits supplied matched
  • One year structural warranty
  • Worldwide shipping experience

Inspection and Packing

Quality control covers material certificates, weld inspection at the boom foot and stick head, bore measurement and a full hydraulic leak test with the supplied cylinders.

long reach boom arm production

Our production team checks reach, lift and hose routing on every long reach boom we build.

Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.

Contact

Tell us the carrier model and reach you require, we will confirm drawing, price and delivery date the same day.

long reach boom arm production

Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.

Sophie - Sales Manager | Defeng Machinery, Guangzhou

Sophie business card Defeng Machinery

siness card Defeng Machinery" style="max-width:100%;width:420px;height:auto;border:1px solid #e4e8ee;border-radius:6px;" />

Contact Details
Defeng Mechanical Manufacturing Limited

Contact Person: Chen

Tel: +8618026254557

Send your inquiry directly to us (0 / 3000)