|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | Customized Tonnage Class Excavator |
|---|---|---|---|
| Maximum Reach: | 15-22 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | custom ton excavator long reach boom,15m long reach boom Q355B,custom long reach boom for SK200-8 |
||
For rental fleets and dealers we produce this long reach boom arm in matched batches for customized tonnage excavators. Reach is 15-22 m, weight is distributed to protect the swing bearing, and every set ships with the correct linkage pins and bushings.
Each set consists of a long boom, a matching stick, hydraulic cylinders, hoses and linkage pins. The Q355B structure is dimensioned for 15-22 m reach, and the counterweight requirement is calculated so the carrier stays stable at full extension.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Product Type | Long Reach Boom Arm |
| Compatible Machine | Customized Tonnage class excavator |
| Maximum Reach | 15-22 m |
| Sections | 2-3 sections |
| Main Material | Q355B |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: this set is built for SK200-8 carriers and can be adjusted for other customized tonnage machines after drawing confirmation.
Everything is made under our own roof: 3000 square meters of production space, a CNC plasma cutting table, hydraulic bending machines, welding jigs operated by senior welders, machining of pin bores, and a painting line. Nothing is outsourced to trading partners.
Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
The set is wrapped in stretch film, banded to a steel frame and loaded into a 20ft or 40ft container depending on reach. Production takes 5-30 days after drawing approval, shipped from Guangzhou or Shenzhen port.
Share your machine model and job site photos, and we will recommend the right boom length and quote within 12 hours.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557