|
Product Details:
|
| MOQ: | 1 Set | Certifiion: | ISO9001:2000 |
|---|---|---|---|
| Compatible Machine: | 35 Ton Class Excavator | Maximum Reach: | 7-30 M |
| Sections: | 2-3 Sections | Main Material: | Q355B |
| Warranty: | 12 Months | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | Product Type: | Standard Boom Arm |
| Highlight: | 35 ton excavator standard boom,7m standard boom Q355B,oem standard boom manufacturer china |
||
Manufactured to order for 35 ton carriers, this standard boom arm provides 7-30 m of working reach with reinforced joints and a balanced centre of gravity. Drawings are approved before cutting, so the finished arm matches your machine and your job requirement.
The boom uses Q355B plate for the main box, with internal baffles at the pivot area and a reinforced heel. Pin bores are line bored after welding so the pins enter without force, and the cylinder mounts are positioned to keep the original geometry of the carrier.
| Product Type | Standard Boom Arm |
| Compatible Machine | 35 Ton class excavator |
| Maximum Reach | 7-30 m |
| Sections | 2-3 sections |
| Main Material | Q355B |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 35 ton machine before cutting.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
Our plant in Guangzhou covers 3000 square meters and handles the whole process in house. Senior welders with more than fifteen years on excavator attachments run the jigs, supported by CNC plasma cutting, a hydraulic press brake, automatic welding stations, shot blasting and a two component paint line.
Inspection happens at three stages: plate thickness and cut accuracy, weld appearance and penetration at critical joints, then final assembly and hydraulic test.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.
Tell us the carrier model and reach you require, we will confirm drawing, price and delivery date the same day.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557