|
Product Details:
|
| Product Type: | Telescopic Boom Arm | Compatible Machine: | 20-40 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 20-33 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 20-40 ton excavator telescopic boom,20m telescopic boom Q355B,custom telescopic boom for SY216 |
||
Contractors order this telescopic boom arm when they need working depth beyond what their carrier was designed for. We build it for 20-40 ton class machines to reach 20-33 m, keeping the original hydraulic circuit, so the excavator stays balanced and the operator keeps the same controls.
The boom uses Q355B plate for the main box, with internal baffles at the pivot area and a reinforced heel. Pin bores are line bored after welding so the pins enter without force, and the cylinder mounts are positioned to keep the original geometry of the carrier.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Product Type | Telescopic Boom Arm |
| Compatible Machine | 20-40 Ton class excavator |
| Maximum Reach | 20-33 m |
| Sections | 2-3 sections |
| Main Material | Q355B |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: this set is built for SY216 carriers and can be adjusted for other 20-40 ton machines after drawing confirmation.
Everything is made under our own roof: 3000 square meters of production space, a CNC plasma cutting table, hydraulic bending machines, welding jigs operated by senior welders, machining of pin bores, and a painting line. Nothing is outsourced to trading partners.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Inspection happens at three stages: plate thickness and cut accuracy, weld appearance and penetration at critical joints, then final assembly and hydraulic test.
Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Tell us the carrier model and reach you require, we will confirm drawing, price and delivery date the same day.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557