|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 20-45 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 16-24 M | Sections: | 2-3 Sections |
| Main Material: | Q690 | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 20-45 ton excavator long reach boom,16m long reach boom Q690,oem long reach boom manufacturer china |
||
For rental fleets and dealers we produce this long reach boom arm in matched batches for 20-45 ton excavators. Reach is 16-24 m, weight is distributed to protect the swing bearing, and every set ships with the correct linkage pins and bushings.
We calculate the section size from the required 16-24 m and the carrier's working weight, then cut Q690 plate accordingly. Welds at the boom foot and stick head are inspected visually and by dye penetrant before the paint stage.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Product Type | Long Reach Boom Arm |
| Compatible Machine | 20-45 Ton class excavator |
| Maximum Reach | 16-24 m |
| Sections | 2-3 sections |
| Main Material | Q690 |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 20-45 ton machine before cutting.
Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.
Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Message us with your model number and country, and we will send the technical proposal and shipping cost together.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557