logo
Home ProductsExcavator Boom Arm

DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction

Certification
China Defeng Mechanical Manufacturing Limited certification
China Defeng Mechanical Manufacturing Limited certification
Customer Reviews
My dear supplier,also my good friend. We have coperation in a long time and I trust you very much. I wish you can be better and better.

—— Stella

Thank goodness I came across you all. The quality and pricing of your products have given me a significant edge in the market.

—— Arlin

I'm Online Chat Now

DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction

DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction
DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction

Large Image :  DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction

Product Details:
Place of Origin: Guangdong, China
Brand Name: DF
Certification: CE, ISO9001
Model Number: Customized
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: USD1000-USD400000
Delivery Time: 14-30 WORK DAY
Supply Ability: 1 set /week

DF Custom 8-80 Ton Excavator Heavy Duty Boom Arm 7-50 m for Jetty Construction

Description
Product Type: Boom Arm Compatible Machine: 8-80 Ton Class Excavator
Maximum Reach: 7-50 M Main Material: Q355B
Warranty: 12 Months MOQ: 1 Set
Lead Time: 5-30 Days Monthly Capacity: 100 Sets
Sections: 2-3 Sections
Highlight:

8-80 ton excavator boom arm

,

7m boom arm Q355B

,

oem boom arm manufacturer china

8-80 Ton Excavator Boom Arm with 7-50 m Reach

For rental fleets and dealers we produce this boom arm in matched batches for 8-80 ton excavators. Reach is 7-50 m, weight is distributed to protect the swing bearing, and every set ships with the correct linkage pins and bushings.

The boom uses Q355B plate for the main box, with internal baffles at the pivot area and a reinforced heel. Pin bores are line bored after welding so the pins enter without force, and the cylinder mounts are positioned to keep the original geometry of the carrier.

long reach boom arm production

Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.

Specifications

Product TypeBoom Arm
Compatible Machine8-80 Ton class excavator
Maximum Reach7-50 m
Sections2-3 sections
Main MaterialQ355B
Surface FinishShot blasting and two component polyurethane paint
Warranty12 months
MOQ1 set
PriceNegotiable
Monthly Capacity100 sets
Lead Time5-30 days
BrandDF
Place of OriginGuangdong, China
CertificationCE, ISO9001

Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 8-80 ton machine before cutting.

Where It Is Used

  • Deep foundation pits and basement excavation
  • Canal, river and reservoir dredging
  • Port and dock wall repair
  • Slope cutting and embankment work
  • Large diameter pipe trenching

Factory and Equipment

Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.

  • Direct from the production floor
  • Custom reach and colour to order
  • Reinforced structure for dredging duty
  • Tested with cylinders before packing
  • Capacity of 100 sets per month

Inspection and Packing

Quality control covers material certificates, weld inspection at the boom foot and stick head, bore measurement and a full hydraulic leak test with the supplied cylinders.

long reach boom arm production

Our production team checks reach, lift and hose routing on every long reach boom we build.

Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.

Contact

Send your excavator model and the working depth you need, and our engineer will reply with a drawing and price within one working day.

long reach boom arm production

Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.

Sophie - Sales Manager | Defeng Machinery, Guangzhou

Sophie business card Defeng Machinery

siness card Defeng Machinery" style="max-width:100%;width:420px;height:auto;border:1px solid #e4e8ee;border-radius:6px;" />

Contact Details
Defeng Mechanical Manufacturing Limited

Contact Person: Chen

Tel: +8618026254557

Send your inquiry directly to us (0 / 3000)