|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 12 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 10-22 M | Sections: | 2-3 Sections |
| Main Material: | Q690 | MOQ: | 1 Set |
| Lead Time: | 5-30 Days | Monthly Capacity: | 100 Sets |
| Warranty: | 12 Months | ||
| Highlight: | 12 ton excavator long reach boom,10m long reach boom Q690,oem long reach boom manufacturer china |
||
This long reach boom arm turns a 12 ton carrier into a 10-22 m machine. It is fabricated in our Guangzhou plant from cut and bent steel plate, jig welded, then pressure tested with its cylinders and hose kit before it leaves the workshop.
Plate is cut on a CNC plasma table, formed on a hydraulic press brake, then assembled in a welding jig. The Q690 box section is welded in passes with interpass cleaning, and the pivot bosses are machined after welding to hold bore alignment.
![]()
Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.
| Product Type | Long Reach Boom Arm |
| Compatible Machine | 12 Ton class excavator |
| Maximum Reach | 10-22 m |
| Sections | 2-3 sections |
| Main Material | Q690 |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 12 ton machine before cutting.
We are the manufacturer, not a middleman. The 3000 square meter workshop runs cutting, bending, jig welding by experienced welders, machining and painting in sequence, which is why we can hold 100 sets per month and still control weld quality.
![]()
Our production team checks reach, lift and hose routing on every long reach boom we build.
Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.
Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
Message us with your model number and country, and we will send the technical proposal and shipping cost together.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557