|
Product Details:
|
| Product Type: | Boom Arm | Compatible Machine: | Customized Tonnage Class Excavator |
|---|---|---|---|
| Maximum Reach: | 7-30 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | custom ton excavator boom arm,7m boom arm Q355B,custom boom arm for DX210 |
||
This boom arm turns a customized tonnage carrier into a 7-30 m machine. It is fabricated in our Guangzhou plant from cut and bent steel plate, jig welded, then pressure tested with its cylinders and hose kit before it leaves the workshop.
Each set consists of a long boom, a matching stick, hydraulic cylinders, hoses and linkage pins. The Q355B structure is dimensioned for 7-30 m reach, and the counterweight requirement is calculated so the carrier stays stable at full extension.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Attachment Type | Boom Arm |
| Suitable Carrier | Customized Tonnage class excavator |
| Max Working Reach | 7-30 m |
| Boom Sections | 2-3 sections |
| Structure Material | Q355B |
| Finish | Shot blasting and two component polyurethane paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
Matching note: this set is built for DX210 / DX255 carriers and can be adjusted for other customized tonnage machines after drawing confirmation.
Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.
Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
The set is wrapped in stretch film, banded to a steel frame and loaded into a 20ft or 40ft container depending on reach. Production takes 5-30 days after drawing approval, shipped from Guangzhou or Shenzhen port.
Send your excavator model and the working depth you need, and our engineer will reply with a drawing and price within one working day.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557