logo
Home ProductsExcavator Boom Arm

DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging

Certification
China Defeng Mechanical Manufacturing Limited certification
China Defeng Mechanical Manufacturing Limited certification
Customer Reviews
My dear supplier,also my good friend. We have coperation in a long time and I trust you very much. I wish you can be better and better.

—— Stella

Thank goodness I came across you all. The quality and pricing of your products have given me a significant edge in the market.

—— Arlin

I'm Online Chat Now

DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging

DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging
DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging

Large Image :  DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging

Product Details:
Place of Origin: Guangdong, China
Brand Name: DF
Certification: CE, ISO9001
Model Number: Customized
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Price: CN¥143,164/acres 1-9 acres
Delivery Time: 10-25 DAYS
Payment Terms: L/C,T/T,Western Union,

DF Custom Customized Tonnage EX200 Excavator Long Reach Boom Arm 7-30 m for Landfill Cell Digging

Description
Product Type: Long Reach Boom Arm Compatible Machine: Customized Tonnage Class Excavator
Maximum Reach: 7-30 M Sections: 2-3 Sections
Main Material: Q690D Warranty: 12 Months
MOQ: 1 Set Lead Time: 5-30 Days
Monthly Capacity: 100 Sets
Highlight:

custom ton excavator long reach boom

,

7m long reach boom Q690D

,

custom long reach boom for EX200

Customized Tonnage Excavator Long Reach Boom Arm with 7-30 m Reach

Contractors order this long reach boom arm when they need working depth beyond what their carrier was designed for. We build it for customized tonnage class machines to reach 7-30 m, keeping the original hydraulic circuit, so the excavator stays balanced and the operator keeps the same controls.

Structural choices are driven by fatigue life: continuous welds instead of stitch welds, rounded transitions at the section change, and a machined pin boss that spreads load into the side plate. Material is Q690D with mill certificates available on request.

long reach boom arm production

Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.

Key Parameters

Minimum Order1 set
Price TermsNegotiable
Monthly Output100 sets
Production Time5-30 days
Brand NameDF
OriginGuangdong, China
CertificatesCE, ISO9001
Attachment TypeLong Reach Boom Arm
Suitable CarrierCustomized Tonnage class excavator
Max Working Reach7-30 m
Boom Sections2-3 sections
Structure MaterialQ690D
FinishShot blasting and two component polyurethane paint
Warranty Period12 months

Matching note: this set is built for EX200 carriers and can be adjusted for other customized tonnage machines after drawing confirmation.

Our Factory

Our plant in Guangzhou covers 3000 square meters and handles the whole process in house. Senior welders with more than fifteen years on excavator attachments run the jigs, supported by CNC plasma cutting, a hydraulic press brake, automatic welding stations, shot blasting and a two component paint line.

long reach boom arm production

Our production team checks reach, lift and hose routing on every long reach boom we build.

  • Direct from the production floor
  • Custom reach and colour to order
  • Reinforced structure for dredging duty
  • Tested with cylinders before packing
  • Capacity of 100 sets per month

Applications

  • Municipal water and gas line trenching
  • Wetland and pond desilting
  • Highway and railway slope repair
  • Demolition of tall structures
  • Flood control channel cleaning

Testing and Delivery

Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.

The set is wrapped in stretch film, banded to a steel frame and loaded into a 20ft or 40ft container depending on reach. Production takes 5-30 days after drawing approval, shipped from Guangzhou or Shenzhen port.

long reach boom arm production

Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.

Contact

Message us with your model number and country, and we will send the technical proposal and shipping cost together.

Sophie - Sales Manager | Defeng Machinery, Guangzhou

Sophie business card Defeng Machinery

siness card Defeng Machinery" style="max-width:100%;width:420px;height:auto;border:1px solid #e4e8ee;border-radius:6px;" />

Contact Details
Defeng Mechanical Manufacturing Limited

Contact Person: Chen

Tel: +8618026254557

Send your inquiry directly to us (0 / 3000)