|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 20-45 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 16-24 M | Sections: | 2-3 Sections |
| Main Material: | Q690 | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 20-45 ton excavator long reach boom,16m long reach boom Q690,oem long reach boom manufacturer china |
||
Contractors order this long reach boom arm when they need working depth beyond what their carrier was designed for. We build it for 20-45 ton class machines to reach 16-24 m, keeping the original hydraulic circuit, so the excavator stays balanced and the operator keeps the same controls.
We calculate the section size from the required 16-24 m and the carrier's working weight, then cut Q690 plate accordingly. Welds at the boom foot and stick head are inspected visually and by dye penetrant before the paint stage.
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
| Product Type | Long Reach Boom Arm |
| Compatible Machine | 20-45 Ton class excavator |
| Maximum Reach | 16-24 m |
| Sections | 2-3 sections |
| Main Material | Q690 |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your 20-45 ton machine before cutting.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
Everything is made under our own roof: 3000 square meters of production space, a CNC plasma cutting table, hydraulic bending machines, welding jigs operated by senior welders, machining of pin bores, and a painting line. Nothing is outsourced to trading partners.
Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Each arm is fixed on a steel skid, wrapped with film and strapped, then loaded by our own crew. Delivery runs 5-30 days from deposit, with shipping arranged from South China ports.
Tell us the carrier model and reach you require, we will confirm drawing, price and delivery date the same day.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557