|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | Customized Tonnage Class Excavator |
|---|---|---|---|
| Maximum Reach: | 18 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | MOQ: | 1 Set |
| Lead Time: | 5-30 Days | Monthly Capacity: | 100 Sets |
| Warranty: | 12 Months | ||
| Highlight: | custom ton excavator long reach boom,18m long reach boom Q355B,custom long reach boom for ZX470 |
||
This long reach boom arm is engineered for customized tonnage excavators that work in dredging, trenching and slope jobs. With 18 m of reach, reinforced box sections and a matched bucket linkage, it delivers long reach performance without changing the base machine.
Plate is cut on a CNC plasma table, formed on a hydraulic press brake, then assembled in a welding jig. The Q355B box section is welded in passes with interpass cleaning, and the pivot bosses are machined after welding to hold bore alignment.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Structure Material | Q355B |
| Finish | Shot blasting and two component polyurethane paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
| Attachment Type | Long Reach Boom Arm |
| Suitable Carrier | Customized Tonnage class excavator |
| Max Working Reach | 18 m |
| Boom Sections | 2-3 sections |
Matching note: this set is built for ZX470 / ZX490 carriers and can be adjusted for other customized tonnage machines after drawing confirmation.
Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.
Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.
Message us with your model number and country, and we will send the technical proposal and shipping cost together.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557