|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 20 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 7-30 M | Sections: | 2-3 Sections |
| Main Material: | Q690D | MOQ: | 1 Set |
| Lead Time: | 5-30 Days | Monthly Capacity: | 100 Sets |
| Warranty: | 12 Months | ||
| Highlight: | 20 ton excavator long reach boom,7m long reach boom Q690D,custom long reach boom for ZX200 |
||
Dredging and deep trench work put heavy bending loads on a long arm. This long reach boom arm answers that with 7-30 m of reinforced reach, thick box sections and stress relieved welds, built here for 20 ton class excavators.
The boom uses Q690D plate for the main box, with internal baffles at the pivot area and a reinforced heel. Pin bores are line bored after welding so the pins enter without force, and the cylinder mounts are positioned to keep the original geometry of the carrier.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
| Attachment Type | Long Reach Boom Arm |
| Suitable Carrier | 20 Ton class excavator |
| Max Working Reach | 7-30 m |
| Boom Sections | 2-3 sections |
| Structure Material | Q690D |
| Finish | Shot blasting and two component polyurethane paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
Matching note: this set is built for ZX200 / ZX210 carriers and can be adjusted for other 20 ton machines after drawing confirmation.
We are the manufacturer, not a middleman. The 3000 square meter workshop runs cutting, bending, jig welding by experienced welders, machining and painting in sequence, which is why we can hold 100 sets per month and still control weld quality.
![]()
Each boom arm is trial-fitted to the carrier model you specify before it leaves the yard.
Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.
Packing uses stretch film, steel bands and a steel base frame, with cylinders protected separately. Lead time is 5-30 days according to customization, and we handle booking and loading documents.
![]()
Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.
Message us with your model number and country, and we will send the technical proposal and shipping cost together.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557