|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | Customized Tonnage Class Excavator |
|---|---|---|---|
| Maximum Reach: | 5-45 M | Sections: | 2-3 Sections |
| Main Material: | Q690 | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | custom ton excavator long reach boom,5m long reach boom Q690,oem long reach boom manufacturer china |
||
Dredging and deep trench work put heavy bending loads on a long arm. This long reach boom arm answers that with 5-45 m of reinforced reach, thick box sections and stress relieved welds, built here for customized tonnage class excavators.
We calculate the section size from the required 5-45 m and the carrier's working weight, then cut Q690 plate accordingly. Welds at the boom foot and stick head are inspected visually and by dye penetrant before the paint stage.
| Product Type | Long Reach Boom Arm |
| Compatible Machine | Customized Tonnage class excavator |
| Maximum Reach | 5-45 m |
| Sections | 2-3 sections |
| Main Material | Q690 |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your customized tonnage machine before cutting.
![]()
Weld seams are inspected and the boom is shot blasted ahead of the two-coat paint finish.
Production takes place in our 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding and a full paint line, and our senior welding team has built excavator attachments for over fifteen years.
Every set is assembled, greased and cycled through its full stroke before shipment, and the inspection report travels with the packing list.
![]()
Our production team checks reach, lift and hose routing on every long reach boom we build.
We load in containers with timber or steel dunnage to prevent movement at sea. Customized sets take 5-30 days to produce, and standard lengths can be ready sooner.
Tell us the carrier model and reach you require, we will confirm drawing, price and delivery date the same day.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557