|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | Customized Tonnage Class Excavator |
|---|---|---|---|
| Maximum Reach: | 18 M | Sections: | 2-3 Sections |
| Main Material: | Q345B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | custom ton excavator long reach boom,18m long reach boom Q345B,oem long reach boom manufacturer china |
||
Contractors order this long reach boom arm when they need working depth beyond what their carrier was designed for. We build it for customized tonnage class machines to reach 18 m, keeping the original hydraulic circuit, so the excavator stays balanced and the operator keeps the same controls.
Plate is cut on a CNC plasma table, formed on a hydraulic press brake, then assembled in a welding jig. The Q345B box section is welded in passes with interpass cleaning, and the pivot bosses are machined after welding to hold bore alignment.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
| Product Type | Long Reach Boom Arm |
| Compatible Machine | Customized Tonnage class excavator |
| Maximum Reach | 18 m |
| Sections | 2-3 sections |
| Main Material | Q345B |
| Surface Finish | Shot blasting and two component polyurethane paint |
| Warranty | 12 months |
Matching note: send us the carrier model and boom pin dimensions, we will adjust the drawing for your customized tonnage machine before cutting.
Our plant in Guangzhou covers 3000 square meters and handles the whole process in house. Senior welders with more than fifteen years on excavator attachments run the jigs, supported by CNC plasma cutting, a hydraulic press brake, automatic welding stations, shot blasting and a two component paint line.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.
We load in containers with timber or steel dunnage to prevent movement at sea. Customized sets take 5-30 days to produce, and standard lengths can be ready sooner.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Send your excavator model and the working depth you need, and our engineer will reply with a drawing and price within one working day.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557