|
Product Details:
|
| Product Type: | Long Reach Boom Arm | Compatible Machine: | 30-100 Ton Class Excavator |
|---|---|---|---|
| Maximum Reach: | 7-30 M | Sections: | 2-3 Sections |
| Main Material: | Q355B | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 30-100 ton excavator long reach boom,7m long reach boom Q355B,custom long reach boom for EC460B |
||
Contractors order this long reach boom arm when they need working depth beyond what their carrier was designed for. We build it for 30-100 ton class machines to reach 7-30 m, keeping the original hydraulic circuit, so the excavator stays balanced and the operator keeps the same controls.
The boom uses Q355B plate for the main box, with internal baffles at the pivot area and a reinforced heel. Pin bores are line bored after welding so the pins enter without force, and the cylinder mounts are positioned to keep the original geometry of the carrier.
![]()
Boom sections are cut and welded in our Guangzhou workshop, then stress relieved before painting.
| Structure Material | Q355B |
| Finish | Shot blasting and two component polyurethane paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
| Attachment Type | Long Reach Boom Arm |
| Suitable Carrier | 30-100 Ton class excavator |
| Max Working Reach | 7-30 m |
| Boom Sections | 2-3 sections |
Matching note: this set is built for EC460B / EC360 carriers and can be adjusted for other 30-100 ton machines after drawing confirmation.
Our plant in Guangzhou covers 3000 square meters and handles the whole process in house. Senior welders with more than fifteen years on excavator attachments run the jigs, supported by CNC plasma cutting, a hydraulic press brake, automatic welding stations, shot blasting and a two component paint line.
![]()
Main boom and stick are jig-welded to keep pin centres within tolerance on every unit.
Before packing, each boom is dimensionally checked against the approved drawing, pin bores are gauged, cylinders are pressure tested and the complete assembly is trial fitted.
We load in containers with timber or steel dunnage to prevent movement at sea. Customized sets take 5-30 days to produce, and standard lengths can be ready sooner.
![]()
Reinforcement plates and pin bosses are fitted on our fabrication line before final assembly.
Share your machine model and job site photos, and we will recommend the right boom length and quote within 12 hours.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557