|
Product Details:
|
| Product Type: | Floating Pontoon | Compatible Machine: | 20-22 Ton Class Excavator |
|---|---|---|---|
| Main Material: | Q355B | Pontoon Count: | 2 Tanks Per Set |
| Buoyancy: | Calculated From Carrier Weight | MOQ: | 1 Set |
| Lead Time: | 5-30 Days | Monthly Capacity: | 100 Sets |
| Warranty: | 12 Months | ||
| Highlight: | 20-22 ton excavator floating pontoon,Q355B amphibious excavator pontoon,custom floating pontoon for DX225 |
||
This floating pontoon converts a 20-22 ton excavator into an amphibious machine that works in water, marsh and soft ground. The tanks are welded in our own workshop, pressure tested for leaks, then painted and fitted with mounting brackets that match the carrier frame.
Each tank has separate sealed chambers so a single damaged compartment still keeps the machine afloat. Steel is Q355B, welding is continuous, and the frame is bolted rather than welded to the carrier for easier transport.
| Product Type | Floating Pontoon |
| Compatible Machine | 20-22 Ton class excavator |
| Main Material | Q355B |
| Pontoon Count | 2 tanks per set |
| Buoyancy | Calculated from carrier weight |
| Surface Finish | Shot blasting and anti corrosion paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: this set is built for DX225 / DH225 carriers, and can be adapted to other 20-22 ton machines after drawing confirmation.
Production takes place in our own 3000 square meter facility in Guangdong. Advanced equipment includes CNC plasma cutting, hydraulic bending, automatic welding stations and a paint line, worked by senior welders who have built amphibious pontoons for over fifteen years.
![]()
Pontoon boxes are welded from marine grade plate in our yard and tested for water tightness.
Before loading, each pontoon is pressure tested, the paint film thickness is checked, and the bolts and brackets are counted against the packing list.
Each set is loaded by our own crew with lifting lugs, secured with steel bands. Production time is 5-30 days and shipping is arranged from South China ports.
Transport note: tanks are sized to fit a 20ft container where possible, and lifting lugs are welded on for crane handling at both ends.
![]()
Side floats and main floats are assembled on the jig before the deck frame is added.
Installation note: engineers can join a video call during installation to confirm bracket position and hose routing.
Service note: replacing a damaged tank section is possible because chambers are separate; spare plates and seal kits can be shipped later.
Customization note: tank length, width and colour can be changed, and your logo can be painted or stencilled before packing.
![]()
Each pontoon set gets a trial float and stability check before it is packed for shipping.
Share your machine model and site photos, and we will recommend the pontoon size and quote within 12 hours.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557