|
Product Details:
|
| Product Type: | Floating Pontoon | Compatible Machine: | 6-30 Ton Class Excavator |
|---|---|---|---|
| Main Material: | Q355B | Pontoon Count: | 2 Tanks Per Set |
| Buoyancy: | Calculated From Carrier Weight | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 6-30 ton excavator floating pontoon,Q355B amphibious excavator pontoon,oem floating pontoon manufacturer china |
||
This floating pontoon is made to order for 6-30 ton excavators used in wetland, canal and pond work. Buoyancy is calculated from the carrier weight so the machine floats level, and the tank seams are welded and tested before painting.
The structure is sized for the carrier's operating weight and digging forces. Q355B plate is used for the shell, stiffeners run along the length of each tank, and mounting pads are positioned to use the original undercarriage bolt pattern.
| Floating Capacity | Calculated from carrier weight |
| Coating | Shot blasting and anti corrosion paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
| Attachment Type | Floating Pontoon |
| Suitable Carrier | 6-30 Ton class excavator |
| Tank Material | Q355B |
| Number Of Tanks | 2 tanks per set |
Matching note: send the carrier model and undercarriage bolt pattern, we will adjust the drawing for your 6-30 ton machine before cutting.
![]()
Walkways, ladders and pump platforms are fitted to customer drawings in our workshop.
We manufacture instead of trading. In 3000 square meters of workshop we cut, bend, weld, machine and paint, using CNC plasma cutting, hydraulic press brakes, welding jigs operated by senior welders, and a finishing line for anti corrosion coating.
We fill and drain test representative tanks, inspect every seam visually and by dye penetrant where required, and measure bracket spacing against the drawing.
Packing uses stretch film, steel bands and timber separators, with brackets and bolts in a separate crate. Lead time is 5-30 days depending on size and customization.
![]()
Pontoon sections are match marked, painted and loaded as a complete kit for the excavator.
Transport note: the set is flat packed with dunnage so two or three units can share a 40ft container, reducing freight per set.
Installation note: we supply a bracket layout drawing and bolt list; most customers complete the conversion in one working day with a crane.
Service note: we keep drawings on file, so repeat orders for the same carrier model are produced without new tooling.
Customization note: extra buoyancy can be added for machines working with a long boom or a heavy dredging bucket.
![]()
Pontoon boxes are welded from marine grade plate in our yard and tested for water tightness.
Message us with your model number and country, and we will send the technical proposal and shipping cost together.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557