|
Product Details:
|
| Product Type: | Amphibious Pontoon | Compatible Machine: | 20 Ton Class Excavator |
|---|---|---|---|
| Main Material: | Q355B | Pontoon Count: | 2 Tanks Per Set |
| Buoyancy: | Calculated From Carrier Weight | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 20 ton excavator amphibious pontoon,Q355B amphibious excavator pontoon,oem amphibious pontoon manufacturer china |
||
Soft ground and shallow water stop a wheeled or tracked machine, and this amphibious pontoon solves that for 20 ton excavators. Welded steel tanks give the buoyancy, and the mounting frame transfers digging forces into the pontoon structure.
The structure is sized for the carrier's operating weight and digging forces. Q355B plate is used for the shell, stiffeners run along the length of each tank, and mounting pads are positioned to use the original undercarriage bolt pattern.
![]()
Walkways, ladders and pump platforms are fitted to customer drawings in our workshop.
| Floating Capacity | Calculated from carrier weight |
| Coating | Shot blasting and anti corrosion paint |
| Warranty Period | 12 months |
| Minimum Order | 1 set |
| Price Terms | Negotiable |
| Monthly Output | 100 sets |
| Production Time | 5-30 days |
| Brand Name | DF |
| Origin | Guangdong, China |
| Certificates | CE, ISO9001 |
| Attachment Type | Amphibious Pontoon |
| Suitable Carrier | 20 Ton class excavator |
| Tank Material | Q355B |
| Number Of Tanks | 2 tanks per set |
Matching note: send the carrier model and undercarriage bolt pattern, we will adjust the drawing for your 20 ton machine before cutting.
We manufacture instead of trading. In 3000 square meters of workshop we cut, bend, weld, machine and paint, using CNC plasma cutting, hydraulic press brakes, welding jigs operated by senior welders, and a finishing line for anti corrosion coating.
Inspection covers plate thickness, weld quality on all seams, pressure testing of each sealed chamber, and a final dimensional check of the mounting frame.
![]()
Pontoon sections are match marked, painted and loaded as a complete kit for the excavator.
Each set is loaded by our own crew with lifting lugs, secured with steel bands. Production time is 5-30 days and shipping is arranged from South China ports.
Transport note: the set is flat packed with dunnage so two or three units can share a 40ft container, reducing freight per set.
Installation note: we supply a bracket layout drawing and bolt list; most customers complete the conversion in one working day with a crane.
![]()
Pontoon boxes are welded from marine grade plate in our yard and tested for water tightness.
Service note: replacing a damaged tank section is possible because chambers are separate; spare plates and seal kits can be shipped later.
Customization note: some customers add walkways, handrails or a small pump platform; we can weld these on request.
Share your machine model and site photos, and we will recommend the pontoon size and quote within 12 hours.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557