|
Product Details:
|
| Product Type: | Floating Undercarriage Pontoon | Compatible Machine: | 20 Ton Class Excavator |
|---|---|---|---|
| Main Material: | Q355B | Pontoon Count: | 2 Tanks Per Set |
| Buoyancy: | Calculated From Carrier Weight | Warranty: | 12 Months |
| MOQ: | 1 Set | Lead Time: | 5-30 Days |
| Monthly Capacity: | 100 Sets | ||
| Highlight: | 20 ton excavator floating pontoon,Q355B amphibious excavator pontoon,oem floating pontoon manufacturer china |
||
This floating undercarriage pontoon converts a 20 ton excavator into an amphibious machine that works in water, marsh and soft ground. The tanks are welded in our own workshop, pressure tested for leaks, then painted and fitted with mounting brackets that match the carrier frame.
Tanks are built from Q355B plate with continuous welds and internal baffles. Each compartment is air pressure tested before assembly, and the mounting frame is machined so the pontoon sits square under the carrier.
![]()
Pontoon boxes are welded from marine grade plate in our yard and tested for water tightness.
| Product Type | Floating Undercarriage Pontoon |
| Compatible Machine | 20 Ton class excavator |
| Main Material | Q355B |
| Pontoon Count | 2 tanks per set |
| Buoyancy | Calculated from carrier weight |
| Surface Finish | Shot blasting and anti corrosion paint |
| Warranty | 12 months |
| MOQ | 1 set |
| Price | Negotiable |
| Monthly Capacity | 100 sets |
| Lead Time | 5-30 days |
| Brand | DF |
| Place of Origin | Guangdong, China |
| Certification | CE, ISO9001 |
Matching note: send the carrier model and undercarriage bolt pattern, we will adjust the drawing for your 20 ton machine before cutting.
Every tank is made under our roof in a 3000 square meter workshop. Equipment includes CNC plasma cutting, hydraulic bending, automatic welding and shot blasting with painting, and the senior welding team has more than fifteen years of experience with excavator attachments.
Inspection covers plate thickness, weld quality on all seams, pressure testing of each sealed chamber, and a final dimensional check of the mounting frame.
![]()
Side floats and main floats are assembled on the jig before the deck frame is added.
Tanks are stacked with timber dunnage, banded and loaded into a 20ft or 40ft container. Production takes 5-30 days after drawing approval, shipped from Guangzhou or Shenzhen.
Transport note: tanks are sized to fit a 20ft container where possible, and lifting lugs are welded on for crane handling at both ends.
Installation note: engineers can join a video call during installation to confirm bracket position and hose routing.
![]()
Each pontoon set gets a trial float and stability check before it is packed for shipping.
Service note: we keep drawings on file, so repeat orders for the same carrier model are produced without new tooling.
Customization note: tank length, width and colour can be changed, and your logo can be painted or stencilled before packing.
Send your excavator model and working water depth, and our engineer will reply with a pontoon drawing and price within one working day.
Sophie - Sales Manager | Defeng Machinery, Guangzhou
![]()
Contact Person: Chen
Tel: +8618026254557